A 1920s Colony With Streets Named for Presidents and Patriots
Masaryktown began in the mid-1920s, when Slovak and Czech immigrants from New York and Pennsylvania bought about 10,000 acres in Hernando County and named the place for Thomas G. Masaryk, the first president of Czechoslovakia. Citrus failed. An egg and poultry farming community grew up in its place. The Florida historical marker on Broad Street stands on the site of the 1925 Masaryk Hotel, which housed the first settlers, and the marker says the colonists named the streets for American presidents and for Slovak and Czech patriots and writers. Wilson, Jefferson, Madison and Lincoln run north and south, and Stur, Hurban and Kollar run east and west.
Masaryktown is small: 1,077 residents and 492 housing units at the 2020 Census. About 83% of the homes are detached houses and 17% are mobile homes. The median home was built in 1990, and the median value is $225,100. For concrete contractors in Masaryktown, that housing mix points to driveway replacements, side-yard patios, shed and workshop pads and long rural entrances more than small manufactured-home pads.
The Masaryk Series: A Sand Named for This Town
Masaryktown has a soil series of its own. The Natural Resources Conservation Service established the Masaryk series in Hernando County in 1976, with its type location about 1.25 miles west of US 41, and calls it of small extent. At 36 sample points inside the town, Masaryk very fine sand covers 91.7%. The rest is Nobleton fine sand, with one point of water.
The official description reads moderately well drained, with a perched water table at 40 to 60 inches for one to two months, and a loamy layer at 70 to 90 inches. The NRCS soil survey rates it not limited for dwellings without basements and puts it in hydrologic group A. For a driveway or patio slab, that means concrete contractors in Masaryktown start with a dry, compactable base. We still grade water away from the slab edge. For a deeper footing, the perched water table is the number to ask about.
At the same points, FEMA zone X covers 97.2% and zone A covers one point. A parcel in a flood hazard area loses the state $7,500 exemption and the county's slab exemption, so look up yours before you plan around either.
Our typical ranges as concrete contractors in Masaryktown. Lot size, access and the permit office move a job inside them.
| Job | Per sq ft | Typical project | What moves the price in Masaryktown |
|---|---|---|---|
| Concrete driveway (4 in., broom finish) | $8 to $14 | $4,000 to $9,800 | Length of a rural entrance, apron and culvert, tear-out |
| Concrete patio | $7 to $12 | $1,680 to $4,800 | Size against the 500 sq ft line, access to the yard |
| Stamped and decorative | $12 to $22 | $3,600 to $14,300 | Pattern, color and sealer |
| Slabs (shed, shop, carport) | $7 to $12 | $1,400 to $7,200 | Footings and permit if it carries a building, thickened edges |
| Sidewalks and walkways | $8 to $14 | $1,600 to $4,200 | Length, job minimum on short runs |
| Repair and resurfacing | Quote only | Free written estimate after we see it | What caused the cracking |
Ranges only. Your price comes in a free written estimate after we see the site, with each line spelled out and no hidden fees.


